|
|
Zurich Siemens Restaurants, Swiss Project, Picture, Design, Architecture
Zurich Architecture : Siemens Restaurants
Building by CamenzindEvolution Architects, Switzerland
Siemens Restaurants, Zurich - Switzerland
The Siemens Restaurants were built following a successful architectural
design competition and represent a new generation of staff catering
facilities.
The building concept reaches beyond just providing subsidised food,
to reflect an all-encompassing understanding for peoples needs
during their working day.

In addition to offering a great choice of different foods, the variety
of dining environments within the building enable visitors to choose
where they wish to eat according to their mood on any given day.
The building concept acknowledges people's desire to relax and mentally
recharge in their lunch hour. The fully glazed façade provides
restorative and uninterrupted views of the water feature and modern
landscaped gardens surrounding the building, while outdoor terraces
invite relaxing al fresco summer dining.
Concept
The restaurant complex is located at the Swiss Headquarters of Siemens
in Zurich and although open to the public, it mainly provides catering
facilities for their 1,500 personnel. The building contains three
restaurants called «Move», «Relax», and «First»
as well as a cafeteria named «Point». It offers seating
for 700 people at any given time.
The cafeteria is open all day and provides indoor and outdoor seating
for 150 people. The main restaurant Move has a capacity
of 350 seats and is self-service. Located adjacent to this in the
main space, separated by a glass partition and with its own entrance,
we find the 150-seat restaurant «Relax». The more formal
50-seat restaurant «First», provides the highest quality
of food and service and has its own private entrance and enclosed
garden.
As the restaurants serve up to 1,500 meals each lunchtime, a very
clear and efficient workflow was of prime importance within the design
brief. The constraint of a very tight budget dictated that the building
volume was kept to an absolute minimum. The architectural concept
was, therefore, achieved by splitting the minimal volume into three
sections and moving these along each other. Through precise overlapping
and intersecting of the separate volumes, the entrance areas and outdoor
and indoor spaces were naturally formed. To enforce the longitudinal
concept of the three building sections, all facades at the ends of
each section are rendered fully openable by means of folding glazed
doors. These connect the internal spaces directly with the outside
terraces of the landscaped gardens.

Landscaping continues the layering of the building, enhancing the
concept by creating distinct characteristics for each outdoor space.
Structure
The building structure is based on a two pin portal frame in the centre,
with outriggers spanning the side wings of the building. Along the
façade two additional three pin frames are created by the tapering
columns. In order to enhance the flow of light, the steel girders
were cut to the minimum structural requirement. For the roof covering,
the concept of differentiation was introduced. For cost reasons, the
structural material also had to form the visible finish. For the busy
cafeteria in the north wing, metal decking was chosen to cover a 7.2
m span between the steel girders. The south wing, with the restaurants
«Move» and «Relax» required a less industrial
atmosphere. Due to the large size of the space (500 seats) the ceiling
had to perform to very high acoustic requirements. The solution was
found with a prefabricated structural timber decking system, which
was both able to span the distance and incorporate insulation, acoustics
and lighting. Furthermore, the entire space of 51x13 metres was
covered, including the final water membrane and all drainage systems,
within two days.
Technique
Due to high ground water levels, the building has no basement and
all plant and storage facilities are located on the first floor. Strict
energy regulations allow the restaurants only to be ventilated and
not air-conditioned. The main challenge for temperature control is
the body heat given off by over a thousand visitors during a two-hour
lunchtime. To avoid overheating on hot summer days, the building can
transform itself into a covered outdoor restaurant by opening up the
entire east and west facades, as well as the large sliding windows
(2.4x4.5m) on the south façade. In this way the building converts
into an outdoor space and any potential heat build-up inside can dissipate.

The Siemens Restaurants are an excellent example of a modern concept
for staff dining facilities that caters for not only the physical,
but also more importantly, the emotional well-being of professional
people.
Zurich Siemens Restaurant: information authorised by Camenzind
Evolution Architecture 040907
Zurich Siemens architects : Camenzind Evolution
Swiss Hotel Building : Hotel
Castell Zuoz
Swiss Architect office
: Camenzind Evolution - Contact details
|
Swiss Buildings - Selection
Kunsthaus Zürich extension
David Chipperfield Architects

image © David Chipperfield Architects
Kunsthaus Zürich
Conversion Theatre 11
EM2N Architects

photograph © Hannes Henz
Zurich theatre
Railway Station Hardbruecke Upgrading
EM2N Architects

photo © Hannes Henz
Zurich Railway Station

World Architecture : e-architect
- key buildings across the globe
Comments / photos for this Zurich Building page welcome: info@e-architect.co.uk
Zurich Siemens Building - page : adrian welch
/ isabelle lomholt |
|
|
|