Great Glen House: Building information from Keppie Design, 2007:
Photos Michael Wolchover, from Keppie Design Feb 2007
GREAT GLEN HOUSE - SCOTTISH NATURAL HERITAGE - KEPPIE DESIGN
The brief Scottish Natural Heritage required new headquarters to accommodate
their relocation to Inverness as part of Scottish Executive decentralisation
strategy. Our challenge was to design and build a building that could
economically meet their highly sustainability-oriented brief, and
create a benchmark for best practice in sustainable commercial building.
The team decided that the whole development also had to reflect the
ethos of SNH as guardians of the Natural Heritage of Scotland, and
their role as promoters of responsible resource use and sustainability.
Accommodation required offices for 300 staff, with meeting rooms,
boardrooms, a library, staff room, workshops, labs and other technical
spaces, associated car parking and extensive landscaping.
The project At £12m construction cost and 6,000 sqm in area
it contains open plan flexible office space and has been designed
around and powered by the main airy atrium space at the heart of the
building, maximising views around and through the building, and reinforcing
connections with the setting. The sense of sitting in the landscape
provides an excellent environment for effective working. The team
devised the atrium element in order to flow circulation and public
functions, to allow a high degree of openness throughout the building
and to drive the air management in the offices.
Design and construction were fully monitored by BRE and on completion
achieved the highest ever office BREEAM score of 84.01%. Post occupancy
evaluation is under way.
Materials, components and systems were A rated according
to the BRE Green Guide. Much of the existing buildings materials
were recycled on site into the new building. It is highly insulated
and airtight, with natural ventilation using the offices exposed
concrete thermal mass for cooling. Solar power is used to preheat
the water. The materials used were generally indigenous to Scotland,
and natural and local wherever possible.
The budget was strict with rental levels for the building being fixed
by SNH and their advisors at the outset, and the project team were
given a timescale of only 19 months from the notification of bid success.
Construction started in April 2005 following receipt of the Bat Licence
and the establishment of temporary Bat roosts, and was completed in
June 2006.
COMPOSITION Using one simple form for the office accommodation is
a response to the order and organisation of SNH, while the stair towers
read as punctuation in the landscape. The elliptical library as a
public knowledge base needed a unique character and its position helps
to define and shelter the entrance and create interest on approach.
Views through the glazed Atrium occur at the arrival courtyard, and
north and south ends, punctuating the composition and give a transparency
that visually opens the whole complex up in both directions.
Boardrooms and ancillary accommodation are carefully wrapped around
the service courtyard, two storeys to north increasing shelter, while
again, through use of a glazed cloister, allowing internal views around
the busy community of the organisation.
Within the Atrium two bridges provide access between the west wings
and the offices and an open stair provides access from Atrium floor.
Views out across grand landscapes are everywhere. Timber is dominant
internally and the overall impression is light and spacious. The health
and wellbeing of the building occupants being a primary driver, it
was decided to work towards a less commercial feel for the workplace
character. Staff eating spaces enjoy sun and landscape both inside
and out.
Materials recycling and specification of green materials The existing
building was incapable of adaptive reuse, however materials were re-used.
The masonry was crushed on site and provided 34% of the high grade
aggregates used in the new building. The slates were re-used as cladding
on the stair towers. Softwood flooring was redressed on site, and
used internally and in external sheltered locations. Items like cast
iron radiators; not warranty-capable, were salvaged locally. Materials
for the building were to be A-rated from the BRE Green Guide
to Specification. Local materials were specified where possible,
particularly for timber cladding (Scottish Larch), which came from
350 tons of manually selected and locally converted logs from locally
managed woodlands. Local main contractor embraced the Considerate
Constructors scheme. Waste Minimisation called for broad use
of standardisation and maximised use of materials minimised waste.
Standard timber sections and profiles were developed efficiently into
bespoke elements. Timber panels and components were standardised..
Predicted water use per occupant pa only 0.99m3 against a best practice
target of 6.4m3. As part of the Considerate Constructors policy, waste
was monitored, and the BRE audited waste and environmental management
monthly. Waste types were separately recycled and all fuel use recorded.
Energy and Water Efficiency Only the server room is artificially cooled.
Offices and meeting rooms are naturally ventilated, driven by passive
solar and wind effects. The Office uses the exposed concrete ceiling
slab as a daytime heat sink. During cooler night periods, high-level
windows open automatically and external air drawn over the slab. During
the day fresh air is drawn into the atrium through the offices either
by manual opening or automatically through BEMS CO2 monitoring. Warm
air discharges from the atrium through 4 high level baffle controlled
independent solar chimneys. Overall this reduces the predicted (TAS
modelling) heating season to only 17 weeks.
17 sqm of evacuated tube solar pre-heat collectors provide 65 to 80%
of hot water needs.
Overall carbon rating for the building - 7.16kg/m2 per annum.
Envelope U-values exceed Building Regulations by 15%.
Air tightness test result - 4.78m3/hr/m2 at 50 Pa.
Rainwater is harvested from the office and atrium roof for toilet
flushing.
Design and construction fully monitored by BRE.
Heating and Hot water use are approximately 50% of accepted benchmark
figures for naturally ventilated buildings.
The EPI (Environmental performance indicator) score was 10 (maximum).
Office lighting daylight sensor and PIR controlled
Landscape was developed along truly indigenous lines with SNH and
Highland Council using species of local provenance from local suppliers.
The SUDS pond/wetland introduces new habitats, encouraging flora and
fauna proliferation. New heated bat roosts are incorporated.
SUMMARY Great Glen House provides a positive contribution to the physical
landscape, the social environment, and the environmental knowledge
base, and sets a new and sustainable standard for commercial development
in sensitive rural settings.
Scottish Natural Heritage HQ: Building text + images from Keppie
Design, 230207
Scottish Natural Heritage HQ wins BRE Office Building of the Year
Award
Great Glen House:
Information from Keppie Design, 2007
Inverness Architecture
Inverness Airport Business Park
Inverness shopping centre
Inverness theatre
Inverness health care building
BCO Award Winner 2007 National
Award - Corporate Workplace
Scottish Natural Heritage
Inverness : Headquarters Building Award PR 21 nov2006
Inverness Buildings
Scottish Natural Heritage HQ
: Sustainable Building
|
Scottish Building News
Scottish Buildings - Selection
Inverness Hub

Inverness Hub
Inverness College Campus

Inverness College
Scottish Architect Studios

World Architecture : e-architect
- key buildings across the globe
Comments or building suggestions / photos for the Scottish Natural Heritage
HQ Building page welcome: info@e-architect.co.uk
Scottish Natural Heritage HQ : page - adrian
welch / isabelle lomholt |
|
|
|