HILTON LONDON TOWER BRIDGE:
CLIENT More London Development
OPERATOR Hilton

DESIGN TEAM
Architect and lead consultant Jestico + Whiles
Interior Designer Jestico + Whiles
FFE specification Jestico + Whiles
Quantity Surveyor E C Harris
Mechanical and electrical engineer Roger Preston Partnership
Adams Kara Taylor Structural Engineer
Services Cost Consultant Mott Green Wall
Fire Engineering Roger Preston Partnership
Lighting Design Partnership Lighting Design
Planning Consultant DP9

Hilton Hotel
London
TIME LINE
October 2003: Jestico + Whiles appointed.
March 2004: Planning Application
October 2004: Planning consent granted
5 October 2004: Start on site
18 September 2006: Practical Completion
25 October 2006: Hotel opened
CONTRACT
Main Contractor: Bovis Lend Lease
Contract period: 23 months
Contact value: £34m
Contract: JCT Standard Form with amendments
Selected sub-contractors: Cladding: GIG Fassadenbau
Concrete: John Doyle
Partitions and ceilings: BDL
Joinery: Ruddy Joinery
Roofs: Briggs Roofing and Cladding Ltd
Bathroom pods: Rasselstein
Hard Floor Finishes: Harper and Edwards
Back of House Joinery: M2 Construction
Signage: Rivermeade
Lifts: Mitsubishi

HOTEL, MORE LONDON
J+W were appointed in October 2003 by More London following a competitive
interview. We had been referred to More London by Hilton as a preferred
designer, following from work at Hilton Canary wharf.
Combined appointments are very rare (unique) in hotel design in UK.
J+W appointed under combined appointment as architects and interior designers
including FFE specification.
J+W also lead consultant and Contract Administrator.
Very fast track project. Less than three years from commencement of design
to opening of hotel.
CONSTRUCTION
Incorporates several so-called modern methods of construction: Unitised
cladding, bathroom pods, pre-finished, pre-cast twin wall
structural party walls.
Frame: Bottom three floors (public areas with longer spans) are a rigid
sway frame of in situ concrete. The upper bedroom levels are
of egg crate form on a 4.200m module, made of twin wall pre-cast walls
and stiffening cores at north, south and central cores.
Cicular columns to lower levels self-finished, cast in polythene sheaths
inside cardboard
Cladding: Unitised panels 1400w x 3000h. Pre-finished including windows,
insulation, vapour barriers, finish in factory in Austria. Panels are
clad in raw (ie not pre-patinated/ oxidised) and extruded terracotta.
Bathroom pods: Concrete shell, pre-finished, installed by structural contractor.

MORE LONDON
More London is one of the biggest development sites in central London
since the war, stretching from Potters Fields adjacent to Tower
Bridge and Hays Galleria and from the Thames to Tooley St.
Masterplan is by Foster Associates, initiated by Ken Shuttleworth prior
to his departure to form Make.
The masterplan design is based around a strong visual axis, or diagonal
from the entrance to the site from Tooley St, to the White Tower of Tower
Bridge. This axis is marked by a stream or rill of running water carved
into the limestone carpet.
The buildings on the site are predominantly commercial offices for blue
chip clients including Ernst and Young and the solicitors Norton Rose
and Lawrence Graham, all attracted south of the river from the city by
the high quality of the development. All buildings are designed bespoke
to the tenants requirements, no pre-lets.
Other buildings include the Unicorn childrens theatre and the GLA.
Cafés and restaurants occupy the ground floor onto the diagonal.
The entire masterplan site is vehicle free, with servicing from basement
level -2, accessed via an underground tunnel. The masterplan is landscaped
with a carpet of dark grey Irish limestone with water baths and fountains.
A major feature is the Scoop, an elliptical outdoor terraced theatre.
Heights of all buildings are limited by strategic views to the dome of
St Pauls Cathedral.
Hilton Hotel London
- Canary Wharf, also by Jestico + Whiles architects
World Architecture : e-architect
- a guide to key buildings across the globe
Hilton Hotel, Terminal 4, Heathrow, southwest London
1990
Manser Associates
London Hotel -
Riverbank Park Plaza Hotel
Hilton London
Hotel architects - Jestico + Whiles