BACKGROUND
Wexford Festival Opera has been running since 1951, playing a central
role in the cultural life of Ireland, and in the world of Opera and
Arts internationally.

Wexford Opera House Photo : Ros Kavanagh
The rebuilding of Wexford Opera House, is one of Irelands most
important cultural projects of recent times, and has been completed
on schedule for the 2008 autumn opera festival.
In a far reaching €33 million building programme to designs by
the Office of Public Works Architects with Keith Williams Architects,
a totally new opera house has been constructed in the town centre
on the site of the old Theatre Royal, the former home of the world
famous opera festival.
The purpose-designed Wexford Opera House contains two theatres of
differing scales. The principal auditorium accommodates 780 seats,
whilst a new adaptable auditorium of 175 seats provides for performance
in a variety of formats.
Facilities in the new 7,500sqm theatre will include:
A 780 seat state of the art auditorium specifically designed for opera
A 175 seat second space for drama, music, and rehearsal
Main stage, orchestra pit, flytower and back stage
Foyers/box office/cloaks/bars and cafe /wcs
Hospitality Areas
Backstage facilities for directors, conductors, designers and singers
Dressing rooms
Chorus Rehearsal Rooms
Prop Making

Wexford Opera House Photo : Ros Kavanagh
DESIGN CONCEPT
Close up, the new building has retained the extraordinary element
of surprise and secrecy so characteristic of the old Theatre Royal,
by re-integrating itself into the historic fabric of Wexford's medieval
centre, behind reinstated terraced buildings. The scale of the Wexford
Opera House building and its contribution to Wexfords silhouette
only becomes truly apparent when the project is viewed from the banks
of the River Slaney. From there the new flytower appears in the skyline
alongside the spires of Wexfords two Pugin inspired churches
and the Italianate tower of the Franciscan Friary, announcing the
presence of an exceptional new cultural building in the historic townscape.
Internally the main auditorium, inspired both by the form of a cello
and the curves of a traditional horseshoe-form operatic space, has
been lined in black American walnut whilst the seating has been finished
in pale purple leather giving a rich sense of material quality to
its contemporary design.
Though primarily conceived for the autumn opera festival, the new
Wexford Opera House building is intended to operate as a year round
arts venue, for both additional Wexford Festival productions and visiting
companies.
CONSTRUCTION CONSTRAINTS
The site limitations could seldom have been more complex. Access to
the site was extremely limited and all vehicle traffic, including
40 tonne articulated vehicles, had to negotiate Wexfords tight
Medieval street pattern. The sloping site was founded on bedrock which
had to be excavated to allow formation of the stage undercroft, orchestra
pit and lower ground levels.
The Wexford Opera House site sits in the centre of an urban block,
and could only be accessed from one point. Construction programming
and logistics were as a consequence particularly difficult. The street
width limitations meant that long span structures such as trusses
above the auditorium and the flytower could only be designed and delivered
in small sections and site assembled to achieve the required component
size. The highly complex steel frame, including curved fronted auditorium
balconies, was assembled in 6 phases working out from the most landlocked
corner of the site (Phase1) to the most accessible sector (Phase 6).
MATERIALS & CONSTRUCTION
The materials selected for the project take account of the colours
and textures of Wexfords indigenous architecture, and its maritime
location.
Materials
Externally, the most visible element of the Wexford Opera House building
is the fly-tower, and this is clad in copper, a material associated
in Irish towns and cities with civic buildings.
In this case, the copper has a pre-oxidised finish. Its shape is morphed
from the expected rectilinear constraints to a more open, exuberant
shape evoking the creative activities occurring within.
Internally, the highlight is the American Black Walnut lining of the
Auditorium. It is sourced from managed forests in Canada, spentds
four months drying out, and is was fixed in the building some six
months after felling.
The lining of the walls, floors and ceilings of the auditorium amounts
to about 3,500 sq.m. or half the size of a football pitch.
The form of the auditorium balcony fronts is complex and in places
triple curved requiring exceptional standards of workmanship for its
effective realisation.
CONTRACT FORM
GDLA 82 with Quantities
PROGRAMME
Design Jul 2003 Jun 2006
Construction Jul 2006 Aug 2008
Despite the enormous complexity of the task, the Wexford Opera House
design team and the contractors delivered the project on schedule
for the autumn 2008 Wexford Opera Festival.
Wexford Opera House - Designers
OPW ARCHITECTS & KEITH WILLIAMS ARCHITECTS : A SUMMARY PROFILE
OPW ARCHITECTS
Pat Cooney, Principal Architect
Klaus Unger, Assistant principal Architect
Ciar·n McGahon, Senior Architect and project Architect for
Wexford Opera House
The Office of Public Works Architectural Services Division is the
State architectural practice, and provides the full range of architectural
services in connection with the portfolio of existing State property
holdings, historic and contemporary, and with new construction projects,
both directly for the State and for bodies promoted or assisted by
the State, as in this case, the new Wexford Opera House. The Division
is one of the largest architectural practices in the country, and
currently processes about half of the workload itself, whilst placing
half with architectural firms in private practice. It is an integral
element in the construction industry in Ireland, and committed to
the support and development of architectural practice in the country,
as witnessed by its Graduate Training Programme, run in conjunction
with the RIAI, in which 30 young graduates are now participating.
Klaus Unger, together with his five Assistant Principal Architects
colleagues, each head one of the six subdivisions of the practice.
Klauss work over the past decades has involved the major institutions
of the State; The National Concert Hall, Government Buildings, The
National Gallery, The National Library, The National Conference Centre,
The Abbey Theatre, inter alia. Ciar·n McGahon, Project Architect
for the Wexford Opera House, has been involved in a variety of building
types for the OPW over the years; he was project architect for the
DÛchas Centre, the city-centre facility which replaced the old
womens prison in Dublin - a complex, innovative and humane solution
to a timeless social necessity, completed in 1999. In recent years
he has been providing architectural input into the procurement of
major State assets through the new procurement methodologies: the
National Stadium, Aquatic Centre, Lansdowne Road Stadium, National
Gallery, Conference Centre, Concert Hall and Abbey Theatre.
Wexford Opera House images / information from Keith Williams Architects
120908
|
Dublin Buildings
Buildings by Keith Williams Architects
Athlone Civic Centre + Square, Athlone, Republic of Ireland
Keith Williams Architects

photo : Eamonn O'Mahony
Athlone Art Gallery
Unicorn Theatre
Chichester District
Museum
Irish Architect Studios
Irish Architecture
RIAI Awards 2009 : Shortlist
Irish Architecture Awards

World Architecture : e-architect
- key buildings across the globe
Comments / photos for the Wexford Opera House Architecture page welcome:
info@e-architect.co.uk
Wexford Opera House - page : adrian welch /
isabelle lomholt |
|
|
|