|
|
Zagrad Center Rijeka, Croatia Building, Project, Photo, News, Design,
Pictures
Zagrad Center Building, Rijeka, Croatia : Information
Stambeno Poslovni centar Zagrad : Mixed-use Development, Croatia
Zagrad Center
randic-turato architects
Project Name: Stambeno Poslovni centar Zagrad
Location: Rijeka, Croatia
Type: Mixed-use
Year designed: 2003
Year built: 2007
Commission type: private client
Area: 18000 m2
Status: built

Zagrad project is located in the center of Rijeka. Project is located
on top of the underground garage with 900 parking places and a future
city train station.
The mixed-use program of 18000 m2 consists of retail and office spaces
and in third of housing. Center is divided in 6 separate office buildings,
each with a different façade, on top of which is laid a continuous
structure of apartments. Seen as the most stable element of the program,
apartments are designed as individual two-storey houses accessed from
the roof terrace with gardens.
Project is characteristic for the modern dynamics, where it is increasingly
difficult for one office to control the whole process of construction.
The plan was made by one office, the garage has been designed by another
one, then the third has designed the access road and the train station,
Randic-Turato was responsible for the main part, the mixed used program,
and in the course of construction other offices have been defining
different interior parts of the building for their clients.

Secondly, the project proves that architecture is too slow. During
the construction there has been a series of modification due to the
change of final users. The project has been constantly confronted
with the situation where it followed-up new requests.
Such context is typical for the commercial projects, that redefines
traditional client-architect relationship. Client being a developer
is no longer the final user and the whole project is normally financed
by another party. Usually, there is also an intermediary between them,
a project manager, who is increasingly taking over the position previously
controlled by the architect.
Nature of the project also influences the design method, that must
count on the project dynamics as the most certain element of the program.
The façades are deliberately disengaged from the inner structure,
which never seemed to stop changing, while the apartments, following
the logic of a self-generating structure have been able to absorb
new staircases, galleries and numerous partitions. In such context
the project must be able to accommodate imperfection. To put it in
simple terms, if Keith Richards stumbles on the stage, it is a normal
part of performance, if the same thing happens to David Bowie, it
is a total disaster. The benefit of imperfection.

Zagrad Center - Credits
Authors: Saa Randic, Idis Turato - Randic-Turato Architects
Client: Austrograd d.o.o. Rijeka
Collaborators: Leora Drazul, Ana Stanicic, Sinisa Glusica, Iva Cuzela
(Technical Architects)
Construction: Dragan Ribaric
Zagrad Center Building Zagreb images / information from randic-turato
architects
|
Croatian Architect Studios
123 Tower - Architecture competition win
3LHD architects

image from 3LHD
Zagreb building
Zagreb Kindergarten
House K Zagreb
House N Croatia
Zagreb Office Tower

World Architecture : e-architect
- key buildings across the globe
Comments / photos
for the Zagrad Center Croatia Architecture page welcome:
info@e-architect.co.uk
Zagrad Center Zagreb Building : page - Adrisn
welch / isabelle lomholt |
|
|
|