Halle Schiebel, Wiener Neustadt Building, Austrian Project, Architect, Photo, Design, Image
Industrial Development in Wiener Neustadt, Austria
Schiebel Building - design by project A01 architects : Architecture Information
Halle Schiebel, Austria
Architects : projecta01
Production facility and office building for
Schiebel Elektronische Geräte GmbH, Wiener Neustadt, Austria
Project Description
"Schiebel Elektronische Geräte GmbH" arranged a strategy competition in summer 2005 for a production hall with an integrated office building, which should represent the identity of the international aviation company. Because of a nearby testing area in close proximity of an airfield, the site in Wiener Neustadt was chosen as a ideal location.

The design of project A01 architects ZT GmbH won the competition and the architects were commissioned to the design the building, the interior and to conduct the construction process. The work started in fall 2005 and lasted until summer 2006. The completion of the interior was finished in 2007. The building is composed of two parts: The office unit is arranged lengthwise facing the street and the production hall is located next to the airfield.
The office area holds the major administrative functions of production, marketing, research and education. The meeting room is attached to a generous deck for visitors, which is used for airshows. The function of the employee's area was considered to be important and accordingly arranged with an own terrace accessible from the lunchroom.
The production area contains two thousand square meters. The hall holds not only an area for assembly and fabrication work, but also an area for design, development and attendance. The autonomous helicopters are developed and manufactured with the latest production processes. The innovative concept and design of the camcopter was awarded with the "Staatspreis für Design 2005", the highest Austrian design award, and is distributed all around the world.
Halle Schiebel Austria - Building Information
Client: Schiebel Elektronische Geräte GmbH, Margaretenstrasse 112, A-1050 Wien
Project management: Leopold Skalsky
Project management interior design: Mag. Irene Schiebel
Architecture + interior design: project A01 architects, ZT GmbH
Designteam: project A01: Arch. D.I. Andreas Schmitzer, Arch. D.I. Maria Planegger,
Arch. Sebastian Michalski, Mag. arch Günther Dreger
Engineering: D.I. J. Gritsch, Wien
Building services: FEMACON Bauconsult GmbH
Site: 3.000 m²
Floor space: Production area : 2298 m², Office space: 1613 m²
Overall: 3911 m² / Converted space: 3529 m²
Competition: jun 2004, Planning started: sep 2004, Building finished: sep 2006
Schiebel Building Austria images / infomration from project A01 architects ZT GmbH
|
Austrian Architects
Austrian Architecture - Selection
Music Theatre, Graz, southeast Austria
UN Studio Architects

photograph : Christian Richters
Music Theatre Graz
Folded House, Vienna Woods, Lower Austria
xarchitekten

picture : Max Nirnberger
Folded House Austria
Gleichenberg Spa, Bad Gleichenberg
JSA

image : Jensen & Skodvin Architects
Gleichenberg Thermal Bath
Comments / photos for the Halle Schiebel Austrian Architecture page welcome:
This email address is being protected from spambots. You need JavaScript enabled to view it.
Halle Schiebel Austria Building : page - adrian welch / isabelle lomholt
|
|
|